at this time red Eagle shows up and said; “the south trail is done and my older brother is starting to go to the east along the pathway, i have hit a small little problem in the north though, i have to use dynamite to blast the rocks apart to finish it!”
“cool, when you get all the rocks broke apart can you hall them all to my rock pile?”
“sure, where is that? i noticed there is none in the entryway now!”
“no i moved them closer to where i need them, that being the smithereens room!”
he showed red where it was and how to get to it from out side or inside the home.
then they went there own way.
he called ADT security company and ordered his full security system to be put in as well before going into the smithery room.
once in the smithery he started to build his forge, the forge is made of stone, he didn’t want to bend over every time he did anything so he made a 3 foot high base.
he didn’t need a very big one either so his forge had a base of about 5 feet wide, it was 9 feet high, then he also made a small step to it that brought the person working the forge up to the point that the rim would be at 3 and a half feet high from the stepping stones, to do this he made a wood frame, square, of 2×4’s on the floor, put down a full coating of clay inside the forge area and stacked a rock layer on the clay,then increased the wood base, added more clay and rocks.
he did that until he had his three foot high base, then waited for the clay to dry, but he did not put clay on the top outer rim of the rocks when he got the three foot high level but the inner portion of the forge he did.
during the next three days cidian went out into the north fields where the rocks were and and started to use the bobcat to level out the field, he took all the rocks on the ground level to an area just south of the rock field and just to the west of the ranching area.
he did this to about 50 acres of land and it took him the entire three days to do it.
on the 4th day he went to the forge and continued to build the forge, he lined the inside of the forge with 2×4’s right over the rime of the outer clay line and then added more to the outer rim of the forge to create the trench need to build the walls of the forge, added clay laid the stone in the trench onto the clay then added more clay and more stone, when the trench was full he built another layer to the walls as before until he got it to be about 4 feet high, then he went back to the larger stone pile inside the field and started to build a stone castle wall that was 25 feet wide and 80 feet high, and 40 feet long.
the castle wall took him about three days to build using the bobcat to move the large rocks and he had to make sure he built a ramp to the top as he built the wall itself.
once the walls of the forge and the castle style walls was done he went to the home and parked the bobcat.
got inside and logged in online, then reached out to his friends and talked for a couple of hours.
the next day he went to town and ordered a glassblowing machine and looked around for someone that was good at both art and pottery work, pottery he was able to hold his own on but drawings of any kind not so much and he needed that kind of expert for the business he planed on starting.
No comments:
Post a Comment